Domtar: biomass-boiler upgrade and mechanical work

CNC Mechanical’s historical Domtar record groups several mechanical and piping scopes in a pulp-and-paper environment. The source may describe multiple assignments rather than one fully defined contract, so the items remain separate factual entries here.

Quebec and Ontario · Boucherville

Published facts

Documented scope

The historical source lists:

  • upgrading the biomass boiler;
  • supply and installation of FRP piping systems;
  • addition and replacement of retaining supports;
  • mechanical and piping installation for the NCC plant;
  • refurbishment of the floor of the overflow tank;
  • mechanical installation in a new lime-kiln section.

NCC is retained without expansion because the source does not define it. No cost saving, production gain, safety result or equipment-performance outcome is documented.

Information needed to complete the case study