Featured projects
- 7.5 MW bulb turbine installation at Chaudière Falls — Ottawa, for Portage Power, with Andritz Hydro. A 136,000 lb unit lifted by a 350-ton mobile crane, then lowered roughly 80 feet into the intake with less than 1/8 in of clearance. Receiving and installation completed the same day.
- Piping installed by helicopter at Valero’s wharf in Lévis — 27 sections placed by air to replace the marine terminal’s fire protection line, site congestion ruling out the use of a crane. Delivered with Valero, Groupe Deric, Helicarrier Inc. and the Local 144 pipefitters.
Other documented work
The records below use only facts available in the historical site.
- Valero Energy (Ultramar) — piping in several areas, a gas line, ethanol line, annual shutdowns and multi-trade work. Published value: $50.0M.
- Greenfield Ethanol — mechanical-equipment installation, structural steel, conveyors and a bucket elevator. Published value: $2.5M.
- Domtar — biomass-boiler modernization, FRP piping, supports, tank work and lime-kiln-related mechanical installation. Published value: $2.8M.
- Suncor — D-4300 reactor mechanical installation, assembly and piping. Published value: $1.6M.
- Ivaco Rolling Mills — casting-arc reconstruction, foundations, structures and continuous-casting-machine installation. Published value: $6.6M.
- Port-Cartier — stacker-reclaimer repair and dismantling within an expansion program. Published value: $13.0M.
- Jacques Cartier Bridge — reinforcement of steel components and gas-line rehabilitation. Published value: $15.0M.
Connect a project to your scope
The implemented site should let buyers filter records by boilermaking, millwright services, structural steel, industrial piping and plant shutdowns, or browse by industry.
Each record can be strengthened when the client supplies approved dates, location, initial challenge, constraints, work sequence and outcome. Production gains, safety results and schedule performance must never be invented.
Discuss your industrial project
Identify the site, work scope, schedule and available documents so the team can establish a practical next step.