Hydrostatic Testing Services for Industrial Piping

CNC Mechanical performs hydrostatic testing for industrial piping when the test boundaries, pressures, medium, acceptance criteria and safety requirements are defined in an approved project package. The service can support newly installed or modified systems before turnover in Quebec and Ontario industrial facilities.

A hydrostatic test is a controlled pressure test, not a generic field check. The owner, engineer or other designated technical authority must establish the applicable code, test pressure, duration, allowable conditions and acceptance process. CNC does not publish a universal test pressure because those requirements vary by system and project.

Quebec and Ontario · Boucherville

A test package built before pressurization

The test plan should be complete before field execution begins. CNC reviews the assigned work against the approved documents and site conditions, including:

  • marked test limits and the components included or excluded;
  • required test pressure, medium, temperature range and hold period;
  • fill, vent, drain and disposal arrangements;
  • calibrated instruments and recording requirements;
  • temporary blinds, supports and connection details;
  • inspection hold points and acceptance signatures; and
  • isolation, exclusion zones and emergency controls.

Water quality, environmental restrictions and protection of sensitive equipment also need to be defined. The project team must identify systems that cannot be exposed to the chosen medium or pressure and specify how they will be isolated.

Request a quote

Tell us about your project

Describe the scope of work and the best way to reach you.

Your information is used only to follow up on your request. Privacy policy. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Coordination with piping installation

Testing is most effective when planned alongside process piping installation. Weld records, examination status, material traceability, supports and line completeness should be resolved before the test boundary is released.

CNC can also review the related pipe supports and tubing or a partner-coordinated fabrication and installation package. Where testing depends on an outage or multiple tie-ins, it may form part of a larger plant shutdown.

CNC’s legacy materials also identify pneumatic testing as a capability. Because stored-energy hazards differ materially from hydrostatic testing, a pneumatic test requires its own approved method, risk controls and authorization; it is never treated as an automatic substitute.

Documentation for handback

Required records may include the approved test package, instrument calibration information, pressure and time records, inspection sign-off, deficiency resolution and final turnover index. The exact deliverables should be listed in the RFQ and quality plan.

Request a quote or contact CNC Mechanical with the system documents and proposed test scope.

Frequently asked questions

Frequently asked questions

What systems can CNC hydrostatically test?

CNC documents hydrostatic testing as an industrial piping capability. Suitability depends on the system design, approved test package, medium, pressure and site controls.

Who determines the test pressure?

The designated project authority establishes the applicable code, pressure, duration and acceptance criteria. CNC executes the assigned field scope to that approved package.

Does CNC also perform pneumatic testing?

CNC’s legacy service materials list pneumatic testing. It requires a separate approved procedure and risk controls because its hazards differ from a liquid-pressure test.

What should an RFQ include?

Provide drawings, marked test boundaries, design and test conditions, medium, instruments, inspection requirements, safety controls, schedule and turnover records.

CNC Mechanical

Plan the next step in your project

Send us the scope, schedule and work location. We will direct your request to the appropriate discipline.

Trusted by

Andritz Hydro logo
Corporation de Gestion de la Voie Maritime du Saint-Laurent logo
Viterra logo
Hydro Ottawa logo
Ville de Montréal logo
Valero logo
Graymont logo
ArcelorMittal logo
CertainTeed (Saint-Gobain) logo
CQ Cement logo
Kronos logo